Online Master Course In Construction Delay Analysis Methodologies With Microsoft Project – Legal Edition

£69.99

Description

A practical, workshop based, intensive course which will explain, step by step, all major delay analyses (including time impact analysis)

Hours of detailed high definition 1080p video tutorials presented by N.M.Raj

Start anytime, anywhere and… complete at your own pace; average completion time is 1-2 weeks

Designed for planning engineers, quantity surveyors, construction lawyers, cost engineers, consultants and engineers

This intensive and practical Master Course consists of 17 Modules (Standard Edition)/19 Modules (Legal Edition) comprised mainly of workshops on delay analysis methodologies in MS Project

Reasonably priced at £49.99 (Standard Edition) and £69.99 (Legal Edition).

Legal Edition contains all modules form the Standard Edition plus additional materials:

  1. 45 min HD video tutorial (with a face camera): Prospective v Retrospective Programme/Schedule Delay Analysis: A Practical/Contractual/Legal Review With a Workshop Demonstration in Primavera P6 (FIDIC, NEC and other forms of Contract)
  2. Slides from the above webinar
  3. Over 2h HD video tutorial – “Extension Of Time Claims under FIDIC – their mysteries unravelled” – N.M.Raj’s seminar presented for FIDIC
  4. Slides from the above webinar
  5. Workshop files from the above webinar

 

TOPICS COVERED

Introduction: Important setting modifications to be made prior to using MS Project for Delay Analysis

MS Project v Primavera: Understanding the key differences between these 2 software packages and why it might be an idea to learn Primavera as well

Logic Links & Constraints: Key advice is given on how to ensure that these issues do not affect your delay analysis

Fragnets & “Bar-Splitting”: These topics are covered in detail and form the basis of all delay analysis methodologies

Delay Analysis: An explanation of each delay analysis methodology followed by a step by step demonstration of the same in MS Project

Time Impact Analysis: This methodology is covered in detail via a 25min video tutorial

Key Errors to avoid: It is possible to make errors which will result in your delay analysis being rejected; guidance is given on key issues to be aware of whilst preparing/submitting a delay analysis

Customization And Coding: Detailed explanation on how to customize MS Project for Delay Analysis and how to code delay events for easy access/review

Concurrent Delay: This complex issue is addressed in detail with a (1) Theoretical explanation (2) Demo in MS Project and (3) Reference(s) to case law

WBS Codes and Activity ID Management:  Advice is given on how to create WBS codes and the importance of the same while carrying out a Delay Analysis

Contemporary records & Strategies: A key presentation on these topics which could prove extremely useful for delay analysts

Who Should Attend?

This Master Workshop is essential for all professionals operating in the real estate & construction industry including contractors, investors, engineers, lawyers, consultants, bankers, insurers and others involved on construction projects

Additional Benefits: Attendees will acquire 6 hours of CPD/PDU

IMPORTANT NOTES ABOUT ENROLMENT – FULLY AUTOMATED 24/7

The Purchase/Enrolment is automated and you may enrol anytime (24/7) – The course will be immediately emailed to you for download

You need a PC/Laptop and an Internet connection to commence/complete the Master Course

Attendees are required to have laptops with MS Project & MS Excel; this is necessary to solve workshops

A trial Version of MS Project may be downloaded from HERE (You will need to register):

https://www.microsoft.com/en-us/evalcenter/evaluate-project-professional-2016

 

Read Brochure

SUBSCRIBE TO RECEIVE ACCESS TO A WEBINAR: 
5 KEY Contractual Issues And Their Answers

Don't forget to confirm your subscription by clicking on the link that will be sent to you
SUBSCRIBE
close-link
Contact